Alternatives Selected for Detailed EvaluationAs required by NEPA, a full range of reasonable alternatives was evaluated in the EIS.
The inclusion of a No Action Alternative is required by NEPA and is the basis against which all other alternatives are compared.
The environmental and technical evaluations performed as part of the Draft EIS (DEIS) indicated that all six of the Action Alternatives (Alternatives 2 through 7) are reasonable. Since release of the DEIS, the alternatives have been modified in three ways. These changes are described in detail in the Supplemental Information Report and generally include:
Reclamation has identified the modified Participants’ Proposed Action as the Agency Preferred Alternative. The alternative selected by Reclamation for implementation will be identified in a Record of Decision. The following links show the alternatives
selected for detailed evaluation in the EIS.
|