Alternatives Selected for Detailed EvaluationAs required by NEPA, a full range of reasonable alternatives will be evaluated in the EIS.
The inclusion of a No Action Alternative is required by NEPA and is the basis against which all other alternatives are compared.
The environmental and technical evaluations performed as part of the Draft EIS (DEIS) indicate that all six of the Action Alternatives (Alternatives 2 through 7) are reasonable. Reclamation compared all of the alternatives in terms of how well they addressed the ten public scoping issues and other relevant environmental and non-environmental issues identified by Reclamation during the DEIS process, including energy use and estimated costs.
Based upon these considerations, Reclamation has initially identified the Participants’ Proposed Action (Alternative 2) as the Agency Preferred Alternative. The following links show the alternatives
selected for detailed evaluation in the EIS.
|